OUR PROJECTS

 

Project Code : PRJ/TCC/2423

 

MSE Wall designing and installation and Installation of Chemical Anchors with 60Kn pull out power (Sub Contract)

Designed and installed the manufactured (customized) eyebolts with special chemical on the natural rock with 6000Kg pulling power in order to build an MSE (Mechanically Stabilized Earth wall) WALL SYSTEM  in the Lusail underpass.

Project : Upgrade of Lusail Circuit – Racetrack and Infrastructure.

Client : Ashghal

Consultant :

Contractor : GET

Our client : Chairman Trading & Contracting

Project Starts in Jan, 4th –  2024

Project Status : Running.

 

Project Code : PRJ/TCC/2321

Restaurant Interior Fit-out works including FF,FS,FA, Electrical,HVAC and MEP works  (Main Contractor)

Project : Fit-out works for Meal Miracle Restaurant in Doha Souq Mall (Shop No:3 / M floor / Al Nasser)

Client : Restaurant Meal Miracle

Consultant : Al Keshaf  Consultants

Sub – Contractors performed for Fire Fighting, Fire Alarm, Fire Safety, Electrical works,  HVAC works, Kitchen Hood and ducts works. TeamEx worked for Plumbing and Civil fit-outs.

Project started in  December 2022

Project Status : Running.

 

Project Code : PRJ/TCC/2320

 

Excavation of trenches & manholes (Sub Contract)

Project : Construction of remaining works, Road & Infrastructure in Al Mearad and Southwest Muither  PCKG1 (DW044-P01).

Client : Ashghal

Consultant : Ital Consult

Contractor : QBS Construction

Project yet to start

Project Status : Awarded.

 

Project Code : PRJ/TCC/2319

 

Excavation of trenches & manholes (Sub Contract)

Project : Construction of remaining works, Infrastructure FS gaps for Bani Hajer and Al Rayyan Stadium PCKG2 (DN117-P02).

Client : Ashghal

Consultant : Ital Consult

Contractor : QBS Construction

Project Starts in May, 17th –  2023

Project Status : Running.

 

 

Project Code : PRJ/TCC/2318

 

Excavation of trenches & manholes (Sub Contract)

Project : C-316 (Roads & Infra in AL EBB & LEABAIB-PKG 2) project.

Client : Ashghal

Consultant : KEO International

Contractor : Qatar Building Company (QBC)

Project Starts in April, 26th –  2023

Project Status : Running.

 

 

Project Code : PRJ/TCC/2117

 

Excavation of trenches (Sub Contract)

Project : Ras Abroug Project

Client : Qatar Airways

Consultant :
Contractor : Construction Development Company (CDC)

Project Starts in December, 29th –  2021

Project Status : Completed.

 

 

Project Code : PRJ/TCC/2116

 

Enabling Works for Dialysis & Diabetes Centre for Hamad Medical Corporation @ Al-Wabb (Sub Contract)

Project : Enabling Works for Dialysis & Diabetes Centre for HMC

Client : Hamad Medical Corporation
Consultant :
Contractor : UCE

Project Starts in October, 17th –  2021

Project Status : Completed.

 

 

Project Code : PRJ/TCC/2115

Excavation of Trenches and Manholes @ Ain Khalid (Sub Contract)
Project : Flood Prevention Scheme Project (FPS-PHASE 3)

Client : Ashghal
Consultant : Parsons
Contractor : HBK

Project Starts in September, 1st –  2021

Project Status : Completed.

 

 

Project Code : PRJ/TCC/2114

Excavation of Trenches and Manholes @ Al Wakra -West (Sub Contract)
Project : Roads & Infrastructure in Wakra West (PH 2, PKG 14)- Package 2

Client : Ashghal
Consultant : Dorsch Qatar
Contractor : UCE

Project Starts in June, 29th  2021

Project Status : Running

 

 

Project Code : PRJ/TCC/2112

Excavation of Trenches and Chambers @ Al Kharatiyat/Izghawa (Sub Contract)
Project : DN002 P02 Road & Infrastructure in Al Kharatiyat and Izghawa Phase 01/ Package 02
Client : Ashghal
Consultant :
Contractor : UCC-INFRA JV (Royal China)

Project Starts in May, 4th  2021

Project Status : Completed

 

Project Code : PRJ1/TCS/2011

Excavation of Trenches and Chambers & Bulk Excavation @ Al Wukair (Sub Contract)
Project : GWC Logistics Park – Phase I
Client : GWC
Consultant : QDC
Contractor :Redco International W.L.L

Project Starts in July, 15th  2020 

Project Status 01 : Running 2nd phase (started from 18th of October 2021)

Project Status 02 : Completed.

 

Project Code : PRJ1/TCS/2010

Construction of Compound Wall & Fabrication & Installation of Gate for a Private Farm House @ Zekreet/Dukhan (Main Contract)
Project : Compound Wall & Gate for Farm House
Client : Private Land Lord
Consultant : N/A
Contractor : TEAMEX

Project Starts in January, 20th  2020

Project Status : Completed

 

Project Code : PRJ1/TCS/1909

Fabrication & Installation of Heavy Trucks Barricade Gates (Gate for Maximum Height) @ Barwa Village
Project : Fabrication & Installation
Client :Barwa Properties Holding Co.
Consultant : —-
Contractor :Waseef

starts on 05th of December 2019

Project Status : Completed

 

Project Code : PRJ1/TCS/1908

Excavation, Backfilling & Compaction @ US Army Base (Sub Contract)
Project : Falcon 3 / Phase II
Client :US Army Base
Consultant : —-
Contractor :United Construction Est.

starts on 28th of August 2019

Project Status : Completed

 

Project Code : PRJ1/TCS/1805

Excavation,Interlock Installation & Asphalt Repair Works @ Barwa Village (Sub Contract)
Project : Excavation & Road Repair Works
Client :Barwa Properties Holding Co.
Consultant : Waseef
Contractor :Waseef

starts on 05th of January 2019

Project Status : Completed

 

Project Code : PRJ1/TCS/1806

300,000 square meter area demolition & clearance including asphalt and concrete roads, Office cabins, Slabs, Steel and debris at green line track yard at Umm Al Afai. (Sub Contract)

Client : Qatar Rail
Consultant :N/A
Contractor :PORR

Project Starts in December, 12th  2018

Project Status : Completed

 

Project Code : PRJ1/TCS/1807

Excavation of Trenches and Chambers, Material Haulage & Equipment Rental @ Al Saliya (Sub Contract)
Project : Pipelines & Roads Project for Al Saliya Army Camp
Client : Ashghal
Consultant : Parsons Brinckerhoff
Contractor :Qatar Building Company (QBC)

Project Starts in December, 2nd  2018

Project Status : Completed

 

Project Code : PRJ1/TCS/1804

Excavation of Trenches and Chambers, Material Haulage & Equipment Rental @ Umm Salal (Sub Contract)
Project : Umm Salal Workers’ Accomodation & Roads Project
Client : Ashghal
Consultant : ITAL CONSULT
Contractor :United Construction Establishment (UCE)

Project Starts in November,  2018

Project Status : Completed

 

Project Code : PRJ1/TCS/1803

Material Haulage & Equipment Rental @ Al Wajba (Rental of Heavy Equipments & Trucks)
Project : Al Bustan Roads Project
Client : Ashghal
Consultant :
Contractor :Hyundai E & C

Project Starts in August,  2018

Project Status : Completed

 

Project Code : PRJ1/TCS/1802

Excavation of Trenches and Chambers @ Lusail
Project : Redline Qatar Rail Project
Client : Qatar Rail
Consultant :
Contractor : RLR JV ( Worked through DOREX Engineering)

Project Status : Completed

 

Project Code : PRJ1/TCS/1801

Limestone Supply & Equipment Rental @ Wakrah
Project : Redline Qatar Rail Project
Client : Qatar Rail
Consultant :
Contractor :Fujita Corporation

Project Status : Completed

 

Project Code : PRJ1/TCS/1701

Excavation of Trenches and Chambers, Material Haulage & Equipment Rental @ Lusail/Alkhor
Project : Alkhor Highway Project
Client : Ashghal
Consultant :KEO International
Contractor : TEKFEN Construction | Sub Contractor : DOREX Engineering

Project Status : Completed